Company Name: *
Company Address : *
Plant
Name: *

Plant
Address : *
Address: * Location: *

Your Name: *

Phone:

Fax:

Email:


1. Do you have an initial desired process?
Calcining  Cooling  Drying  Granulation/Agglomeration  Incineration 
Mixing  Other (additional details)

2. Do you have an initial desired equipment?
High Temperature Indirect Calcining  High Temperature Rotary Kiln  Rotary Granulators/Agglomerators  Rotary Dryer  Indirect Dryer  Flash Dryer  Spray Dryer  Fluid Bed Processor  Rotary Cooler  No, let CresTechnologies investigate  Other (additional details)
3. Is process based upon
8 hours  per day 5 days per week Est. days per year
12 hours   7 days  
24 hours     
4. Will processing be Continuous  Batch 
5. Can product material be brought into contact with products of combustion? Yes  No 
Additional details:
6. Does the product material need to be processed under any special atmosphere or gas? Yes  No      Additional details (ie. special gas composition, oxidizing/reducing/inert gas requirements, etc.)
7. Is the process Endothermic  Exothermic  Other
(Additional details)

Material Description
8. Name of material   9. Chemical composition (formula)
10. Detail any Chemical Reactions
11. Material Characteristics: Feed Discharge 12. Screen Analysis: Feed Discharge
Feed Rate (total)   100% plus
Product Rate (total)   5% minus
Moisture Content (free) 10% minus
Moisture Content (bound) 20% minus
Volatile Content 30% minus
Bulk Density 40% minus
Specific Gravity 50% minus
Specific Heat 60% minus
Angle of Repose 70% minus
Temperature 80% minus
Maximum Permissible Temperature 90% minus
Maximum Exposed Temperature 95% minus
      100% minus
13. Particle size, or amount allowed to be lost as carryover from dusting?
%  minus
14. What is the general nature of the feed material's handling capability? (check all that apply) Sticky Cohesive Plastic Abrasive Free Flowing Corrosive Viscous Other
15. What is the general nature of the product material's handling capability? (check all that apply) Sticky Cohesive Plastic Abrasive Free Flowing Corrosive Viscous Other
16. Does the material go through a sticky phase, or any other phase change, as it heats up? Yes No  
Additional details
17. General remarks: 
Locale Information
18. Plant Elevation 19. Avg. Summer Temperature 20. Avg. Winter Temperature
    21. Avg. Summer Humidity 22. Avg. Winter Humidity
23. Does locale abrasive or corrosive conditions exists? (ex. airborne sand, marine conditions, etc.)  Yes No
Additional details
24. Local air quality or emission standards? Governing Agency Governing Office
Additional details
25. Local liquid or effluent standards? Governing Agency Governing Office
Additional details
26. Will equipment be located indoors or outdoors? Indoors Outdoors Outdoors and Protected
27. Area Rating: Non-Hazardous Hazardous   Classification

Utilites
28. Fuel:   Gas, type  Oil, type Saturated Steam Superheated  Steam   Other
Pressure
Heating Value

29. Electricity Available 30. Water Available 31. Compressed Air
Process Potable Plant Signal
volts psi psi psi psi
phase GPM GPM CFM CFM
hertz °F °F

Additional Information:

(Please feel free to provide any additional information, sketches, flow diagrams, specification and details that may aid us in helping you better.)


Project Information
Scope of Supply (CresTechnologies can provide an all inclusive supply, from engineering and equipment supply; to installation.  Below is an initial survey of the scope that you may prefer CresTechnologies to provide.)
32. Do you possibly want CresTechnologies to supply the feed system to the equipment? Yes No 
Additional details
33. Do you possibly want CresTechnologies to supply the receiving system from the equipment? Yes No 
Additional details
34. Do you possibly want CresTechnologies to supply the pollution abatement equipment for the equipment? Yes No Additional details
35. Do you possibly want CresTechnologies to supply the installation of the equipment? Yes No 
Additional details

Scheduling (The below data may better provide an accuracy to any pricing, availability of purchase data, or allocation of labor resources.  This data is understood to be initial and does not constitute a commitment by you.)
36. What phase is this project currently in? Feasibility  Study For Appropriation For Approval For Construction Other  Additional details:
37. When will engineering be released? (quarter) of (year)
38. When will equipment specifications be released? (quarter) of (year)
39. When is equipment purchases expected? (quarter) of (year)
40. When is project completion expected? (quarter) of (year)
 



Home | Design and Engineering Services | Equipment and Product Services
Field and Construction Services | Industries Served | About Us | Questionnaire | Contact

CresTechnologies, Inc.
P.O. Box 57 | Ingomar, PA 15127
Phone: 412.366.7150 | Fax: 412.366.7557
Email: sales@crestechnologies.com